top of page

SUPPLY, LOAD AND TRANSPORT OF SUITABLE CLAY LINING MATERIAL FOR USE IN LANDFILL WORKS

  • 30,000T Material Moved for the Project

  • 10 Truck combinations including B Double

  • 24km round trip per truck, per load

  • More than 2,500T Material moved per day

  • Advanced Pay load Scales Technology

Loading with our current model Excavators which are fitted with advanced Pay Load Scales technology, we were able to maximize loading efficiency and ensure compliance of legal load limits to gain optimal results for our client.

 

Equipped with an ever-growing fleet of highly maintained and reliable truck combinations including Truck and Dog, Semi Tippers, B Doubles, Belly Dumpers, B Double Walking Floors and Singles, we utilized just some of our equipment to suit the specific needs of this project.

bottom of page