top of page

NORTH BRANCH CHANNEL, YENDA NSW

Excavate and transport material transport of the North Branch Channel for the MIA Renewal Alliance which included:

  • 22km Channel 

  • 400,000 cubic meters of material

  • 4 Months duration

© 2021 by EXTONS PTY LTD

  • Instagram
  • Black Facebook Icon
  • Black YouTube Icon
bottom of page